Route My World!

A CCNA/CCNP Blog

Archive for March 19th, 2009

First Phase of BCMSN Study Schedule

Posted by Aragoen Celtdra on 19th March 2009

It’s been 3 days in the making, but I’ve got the first phase of my study schedule completed. See the list by clicking on the BCMSN STUDY SCHEDULE tab on top of the page.

This week’s scheduled reading is posted below. I’ve already read ahead so I’ve completed the scheduled readings up to Friday. I’m starting the Saturday schedule tonight and hopefully be able to stay ahead of the game in case my wife gives birth a little earlier than expected.

Mon, 16-Mar-09: Chapter 1: Read pp. 3 – 30 – Enterprise Network Architectures: Enterprise Composite Model, SONA, IIN, etc
Tue, 17-Mar-09: Chapter 1: Read pp. 31 – 60 – Continuation of Enterprise Model, Intro to Catalyst switches
Wed, 18-Mar-09: Chapter 2: Read pp. 61 – 92 – Data-link layer technologies, Multilayer switched network design.
Thur, 19-Mar-09: Chapter 3: Read pp. 95 – 125 – Initial Catalyst switch configurations, IOS File System (IFS), Software images.
Fri, 20-Mar-09: Chapter 3: Read pp. 125 – 147 – Basic switch troubleshooting practices.
Sat, 21-Mar-09: Chapter 4: Read pp. 149 – 185 – VLANs: configuring , verifying , Private VLANs, VLAN trunking.
Sun, 22-Mar-09: Chapter 4: Read pp. 185 – 215 – VLAN Trunking Protocol (VTP), End of chapter exercises.

Posted in BCMSN Prep, CCNP, Study Strategy | 5 Comments » | Print This Post

 

Route My World! is Digg proof thanks to caching by WP Super Cache